<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Electrogrup</title>
	<atom:link href="https://electrogrup.ro/en/feed/" rel="self" type="application/rss+xml" />
	<link>https://electrogrup.ro/en/</link>
	<description>Infrastructure for better</description>
	<lastBuildDate>Wed, 17 Apr 2024 12:32:30 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=5.7.15</generator>

<image>
	<url>https://electrogrup.ro/wp-content/uploads/2018/07/LGOELECTRO-150x150.jpg</url>
	<title>Electrogrup</title>
	<link>https://electrogrup.ro/en/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>BERCENI ROAD JUNCTION</title>
		<link>https://electrogrup.ro/en/berceni-road-junction/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=berceni-road-junction</link>
		
		<dc:creator><![CDATA[Danco]]></dc:creator>
		<pubDate>Wed, 17 Apr 2024 12:32:30 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://electrogrup.ro/?p=11275</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[<p>Location: București Beltway &ndash; DJ401 (km 33+190 &ndash; km 35+603) Project description: construction of a roundabout suspended over the București South Beltway Technical specifications: &ndash; widening the beltway to 4 lanes &ndash; 30 pillars, 6 ledges, monolith infrastructure, superstructure: prefabricated beams, metal deck for the suspended roundabout &ndash; construction of side roads / easement road...</p>
<p><a href="https://electrogrup.ro/en/berceni-road-junction/" rel="nofollow">Source</a></p>]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>REGENERATION OF THE URBAN SPACE ADJACENT TO THE YOUTH PARK IN THE MUNICIPALITY OF BUZăU</title>
		<link>https://electrogrup.ro/en/regeneration-of-the-urban-space-adjacent-to-the-youth-park-in-the-municipality-of-buzau/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=regeneration-of-the-urban-space-adjacent-to-the-youth-park-in-the-municipality-of-buzau</link>
		
		<dc:creator><![CDATA[Danco]]></dc:creator>
		<pubDate>Wed, 17 Apr 2024 12:31:51 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://electrogrup.ro/?p=11274</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[<p>This project proposes the arrangement of green spaces within the site, organized in five intervention areas: the leisure area, the culture area, the countryside area, the massif area, and the alveoli area. Built area: pedestrian walkways &ndash; 5,725 sq m and playground area 1,190 sq m Green spaces &ndash; 60 194 sq m Start: 10.05.2021 Completion: 30.06.2023...</p>
<p><a href="https://electrogrup.ro/en/regeneration-of-the-urban-space-adjacent-to-the-youth-park-in-the-municipality-of-buzau/" rel="nofollow">Source</a></p>]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>EXTENSION AND INTERIOR RECOMPARTMENTATION OF THE TURDA RIDING ARENA</title>
		<link>https://electrogrup.ro/en/extension-and-interior-recompartmentation-of-the-turda-riding-arena/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=extension-and-interior-recompartmentation-of-the-turda-riding-arena</link>
		
		<dc:creator><![CDATA[Danco]]></dc:creator>
		<pubDate>Wed, 17 Apr 2024 12:30:55 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://electrogrup.ro/?p=11273</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[<p>Location: 7, Aleea Durgăului, Mun. Turda, Cluj County. The project consists of the demolition, reconstruction and interior re-compartmentalization of a multi-purpose building. The new construction will include an indoor riding arena, horse stalls, restaurant, hotel, conference room, event hall and terrace. The building has a P+Mez.+2E+R height scheme, with a total of 58 rooms. Built area: 7974.8...</p>
<p><a href="https://electrogrup.ro/en/extension-and-interior-recompartmentation-of-the-turda-riding-arena/" rel="nofollow">Source</a></p>]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>POWER PLANT CEG 4+5, CAMPIA TURZII</title>
		<link>https://electrogrup.ro/en/power-plant-ceg-45-campia-turzii/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=power-plant-ceg-45-campia-turzii</link>
		
		<dc:creator><![CDATA[Danco]]></dc:creator>
		<pubDate>Wed, 17 Apr 2024 12:29:59 +0000</pubDate>
				<category><![CDATA[CIVIL CONSTRUCTION]]></category>
		<guid isPermaLink="false">https://electrogrup.ro/?p=11272</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[<p>Location: C&acirc;mpia Turzii, str. Laminoristilor, no. 157, Cluj county The project consists in increasing the production capacity of the Nova Power &amp; Gas Electroenergetic Ensemble consisting of two CEG1 + 2 Power Plants executed in 2021 and those that will be built this year, respectively CEG 4+5. The installed power of the 4 groups is 26.88 MW (2&times;6 .72MW+2&times;6.72MW) Construction includes: metal...</p>
<p><a href="https://electrogrup.ro/en/power-plant-ceg-45-campia-turzii/" rel="nofollow">Source</a></p>]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>AIRPORT MARKING AND LANDSCAPING, BRASOV-GHIMBAV AIRPORT</title>
		<link>https://electrogrup.ro/en/airport-marking-and-landscaping-brasov-ghimbav-airport/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=airport-marking-and-landscaping-brasov-ghimbav-airport</link>
		
		<dc:creator><![CDATA[Danco]]></dc:creator>
		<pubDate>Wed, 17 Apr 2024 12:29:07 +0000</pubDate>
				<category><![CDATA[CIVIL CONSTRUCTION]]></category>
		<guid isPermaLink="false">https://electrogrup.ro/?p=11271</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[<p>The project consisted in systematizing and consolidating the terrain around the runway, in order to ensure its stability and allow a safe running of an aircraft in the event of an accidental derailment. The project also involved the supply of equipment and the complete execution of the beacon system, on the entire operating area of the airport (landing, take-off, maneuvering and parking of the...</p>
<p><a href="https://electrogrup.ro/en/airport-marking-and-landscaping-brasov-ghimbav-airport/" rel="nofollow">Source</a></p>]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>VIADUCT OVER CFR LINE AND HIGHWAY</title>
		<link>https://electrogrup.ro/en/viaduct-over-cfr-line-and-highway/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=viaduct-over-cfr-line-and-highway</link>
		
		<dc:creator><![CDATA[Danco]]></dc:creator>
		<pubDate>Wed, 17 Apr 2024 12:28:16 +0000</pubDate>
				<category><![CDATA[CIVIL CONSTRUCTION]]></category>
		<guid isPermaLink="false">https://electrogrup.ro/?p=11270</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[<p>Project description: Viaduct on DN14A over highway and CFR line &ndash; Structure 2 Transylvania Highway Technical Specs: &bull; 380 m long and 12 m wide massive harbour infrastructure with circular posts and upper ruler &bull; indirect foundations on large diameter piles &bull; massive reinforced concrete radar &bull; superstructure of 5 prefabricated precast beams &bull; sidewalks with the carriageway &bull; directional H4B sill &bull;</p>
<p><a href="https://electrogrup.ro/en/viaduct-over-cfr-line-and-highway/" rel="nofollow">Source</a></p>]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>CEF 30 MW DOICEȘTI</title>
		<link>https://electrogrup.ro/en/cef-30-mw-doicesti/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=cef-30-mw-doicesti</link>
		
		<dc:creator><![CDATA[Danco]]></dc:creator>
		<pubDate>Wed, 17 Apr 2024 12:14:21 +0000</pubDate>
				<category><![CDATA[ENERGY]]></category>
		<guid isPermaLink="false">https://electrogrup.ro/?p=11268</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[<p>Placement of metallic structures and 650 W and 655 W solar panels on the surface of the slag deposit from the old Doicesti thermal power plant for the creation of a renewable energy production unit with a total installed capacity of 30 MW Number of metal structures 1527 pcs Monocrystalline-bifacial photovoltaic panels: 46,332 pcs Start: 01.2023 Completion: 07.2023...</p>
<p><a href="https://electrogrup.ro/en/cef-30-mw-doicesti/" rel="nofollow">Source</a></p>]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>MODERNIZATION OF THE 110/20 KV DOICEȘTI STATION</title>
		<link>https://electrogrup.ro/en/modernization-of-the-110-20-kv-doicesti-station/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=modernization-of-the-110-20-kv-doicesti-station</link>
		
		<dc:creator><![CDATA[Danco]]></dc:creator>
		<pubDate>Wed, 17 Apr 2024 12:12:12 +0000</pubDate>
				<category><![CDATA[ENERGY]]></category>
		<guid isPermaLink="false">https://electrogrup.ro/?p=11266</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[<p>A photovoltaic park was built, with an installed power of 30 MW, made with 36,800 Trina panels &ndash; 655 W, 122 Huawei inverters &ndash; 215 kW, 9 Huawei 20 / 0.8 kV &ndash; 3.4 MVA transformer stations and the 110 / 20 kV Doicești transformer station was modernized, it being equipped with a 63 MVA transformer Built area: 30 ha Start: 2023 Completion: August 2023...</p>
<p><a href="https://electrogrup.ro/en/modernization-of-the-110-20-kv-doicesti-station/" rel="nofollow">Source</a></p>]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>CONSTRUCTION OF PHOTOVOLTAIC PARK CEF 3 &#8211; NERVIA</title>
		<link>https://electrogrup.ro/en/construction-of-photovoltaic-park-cef-3-nervia/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=construction-of-photovoltaic-park-cef-3-nervia</link>
		
		<dc:creator><![CDATA[Danco]]></dc:creator>
		<pubDate>Wed, 17 Apr 2024 12:10:23 +0000</pubDate>
				<category><![CDATA[ENERGY]]></category>
		<guid isPermaLink="false">https://electrogrup.ro/?p=11264</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[<p>Address: Doicesti commune, Dambovita county. Placement of metallic structures and 650 W and 655 W solar panels on the surface of the slag deposit from the old Doicesti thermal power plant for the creation of a renewable energy production unit with a total installed capacity of 30 MW Number of metal structures 1527 pcs Monocrystalline-bifacial photovoltaic panels: 46,332 pcs Start: 01.2023...</p>
<p><a href="https://electrogrup.ro/en/construction-of-photovoltaic-park-cef-3-nervia/" rel="nofollow">Source</a></p>]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>IAZ 220/110 kV POWER STATION</title>
		<link>https://electrogrup.ro/en/iaz-220-110-kv-power-station/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=iaz-220-110-kv-power-station</link>
		
		<dc:creator><![CDATA[Danco]]></dc:creator>
		<pubDate>Wed, 17 Apr 2024 12:06:43 +0000</pubDate>
				<category><![CDATA[ENERGY]]></category>
		<guid isPermaLink="false">https://electrogrup.ro/?p=11261</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[<p>Refurbishment of an existing power station. The works took place while keeping the electrical networks, control room, medium voltage networks and the internal services of the station in working order during the project. Successfully completed: &ndash; Project Management &ndash; Turnkey design &ndash; Primary and secondary 220, 110, 20, 0.4 kV equipment installation &ndash; SCADA system integration Modernization for: &ndash; 2...</p>
<p><a href="https://electrogrup.ro/en/iaz-220-110-kv-power-station/" rel="nofollow">Source</a></p>]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
