VIADUCT OVER CFR LINE AND HIGHWAY
Project description: Viaduct on DN14A over highway and CFR line – Structure 2 Transylvania Highway
Technical Specs:
• 380 m long and 12 m wide massive harbour infrastructure with circular posts and upper ruler
• indirect foundations on large diameter piles
• massive reinforced concrete radar
• superstructure of 5 prefabricated precast beams
• sidewalks with the carriageway
• directional H4B sill
• pedestrian shelter
• protective mesh