This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
All posts by: Danco
August 27, 2018
August 27, 2018
DRUMUL MORARILOR 110KV POWER STATION
DRUMUL MORARILOR 110KV POWER STATION The works included: Refurbishment of the command-control room (ceiling, lighting, power, heating and air conditioning, partition walls) Repairs to the installations (replacement of pipes, including water leaks, ceramic tile fitting) Concrete foundations and support pillars for the mounting of the modular equipment Repairs to the foundation of the neutral treatment [...]
August 27, 2018
BUZAU CRANG 110/20KV POWER STATION
BUZAU CRANG 110/20KV POWER STATION The works included: Installation of LES 20 kV power lines - 1,5km Reconstruction of the medium voltage grids with jointing and terminlas (34 pcs) for the interconnection with substations Installation of new MV equipment (15 cells) and 20 kV switchgear connections Refurbishment of the control room Construction of concrete foundations [...]
August 16, 2018
Fiber optic installation for the connection of 5124, mobile telephony site
Fiber optic installation for the connection of 5124, Gura Humorului mobile telephony site The project consisted in the construction of two ADSS fiber optic networks (an underground and an overhead line) for the connection of the Vodafone 5124 Gura Humorului mobile telephony station. The overhead line has a length of 1195 meters and involved the [...]
August 14, 2018
CFR CARANSEBES 110KV POWER STATION
CFR CARANSEBES 110KV POWER STATION The projected involved the refurbishment of an existing power station: a new modular control room, fences, VT , control cables, lightning and srveillance. The works took place around an operating 110kV LEA networks. The works included: A new modular control room A new concrete foundation for VT Civil works: concrete [...]
August 14, 2018
BLAJ 110/20/6KV POWER STATION
BLAJ 110/20/6KV POWER STATION The project involved the refurbishment and construction works within an existing power station. The works were carried out in the conditions of maintaining the functioning of the installations for ensuring the customers continuous power supply The works included: Refurbishment of the control building and roof Replacing the old concrete foundations with [...]
August 14, 2018
VULCAN 110/20/10KV POWER STATION
VULCAN 110/20/10KV POWER STATION Civil works included: Replacement of the 110 kV transformer cell lines through the decommissioning of the existing GIS cells; installation and commissioning of a new hybrid equipment Replacement of the neutral treatment groups and the installation of a fault current detection on all MV feeders; Replacement of the 110 kV power [...]
August 14, 2018
JUCU 110/20KV POWER STATION
JUCU 110/20KV POWER STATION The renovation and construction works within the existing operating 110kV power station included: replacement of the existing cells, of the relay room, MV switchgear room, LV services and electrical equipment Civil works included: Refurbishment of the control and connection building; Replacing of the existing foundations; Replacing the concrete old structure with [...]
August 14, 2018
Fiber optic installation for the connection of 822 mobile telephony site
Fiber optic installation for the connection of 822 Baisa mobile telephony site The project consisted in the construction of an ADSS fiber optic underground network between the Vodafone 822 Baisa mobile telephony station and the 110 kW pole nr.61 of LEA Botosani, Suceava county. The total lenght of the network is 2530 meters