The projected involved the construction of a 110/20kV power station
The works included:
- Building the command-control-building with roof
- Concrete foundations and roads, concrete and steel structure to support the equipment
- Replacing and connecting a 110kV pylon (including the foundation)
- 110kV equipment – 110/20kV power transformer, full line cells (2) and transformer, split cell with separators – MV equipment (16 cells), internal service transformers, AC and DC neutral treatment group
- Connecting the new power station to the power system (to the 110kV power network and medium voltage networks)
- Civil works: fences, lightning, courtyard with green space and alleys, access roads, sewerage, concrete alleys around the building
Electrogrup successfully completed:
- Designing the construction details and drawing up the as-built documentation
- Project Management – our teams coordinated the entire work
- Health and Safety coordination
- Primary and secondary equipment installation
- SCADA system
Challanges:
- Constructing a new power station
- Working in hard winter conditions and time constraints