This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
CIVIL CONSTRUCTION
April 17, 2024
by Danco
in CIVIL CONSTRUCTION
April 17, 2024
by Danco
in CIVIL CONSTRUCTION
AIRPORT MARKING AND LANDSCAPING, BRASOV-GHIMBAV AIRPORT
The project consisted in systematizing and consolidating the terrain around the runway, in order to ensure its stability and allow a safe running of an aircraft in the event of an accidental derailment. The project also involved the supply of equipment and the complete execution of the beacon system, on the entire operating area of [...]
April 17, 2024
by Danco
in CIVIL CONSTRUCTION
VIADUCT OVER CFR LINE AND HIGHWAY
Project description: Viaduct on DN14A over highway and CFR line - Structure 2 Transylvania Highway Technical Specs: • 380 m long and 12 m wide massive harbour infrastructure with circular posts and upper ruler • indirect foundations on large diameter piles • massive reinforced concrete radar • superstructure of 5 prefabricated precast beams • sidewalks [...]
July 12, 2021
by Danco
in CIVIL CONSTRUCTION
NATURAL GAS POWER PLANT, CAMPIA TURZII
The project includes the realization of an electric power assembly consisting of two power plants equipped with generating sets with gas motors, with an individual capacity of 6.72 MW, and the extension of the 20kV distribution network. The duration of the works is five months. The plant is located in the Reif Industrial Park, near [...]
July 12, 2021
by Danco
in CIVIL CONSTRUCTION
PL EGGER BISKUPIEC INDUSTRIAL PLATFORM, POLAND
Technical details: Earthworks: approx. 1.000.000 m3 of soil stabilization with binder Land improvement works: approx. 600.000 m3 depth improvement Peat extraction: approx. 70.000 m3 Structure construction works: approx. 120.000 m2 Monolithic reinforced concrete: approx. 75.000 m3 Platforms asphalting works: about 200.000 m2
July 12, 2021
by Danco
in CIVIL CONSTRUCTION
KPN 5G INSTALLATIONS, HOLLAND
The 5G KPN project, developed in partnership with Engie Fabricom Belgium, consists of SWAP for existing 2G, 3G and 4G technology sites with Huawei 5G equipment.
August 14, 2018
by Danco
in CIVIL CONSTRUCTION
Concrete structures
Concrete structures Surface: 30.384 m2 Glass foundations: 187 cubic meters Prefabricated poles: 212 pcs Prefabricated panels: 395 t Concrete monolot: 30 Execution time: 7 months and 2 weeks
August 14, 2018
by Danco
in CIVIL CONSTRUCTION
Construction work for bed and breakfast
Construction work for bed and breakfast Surface: 1140 m2 Number of personal in charge: 61 Execution time: 5 months
August 14, 2018
by Danco
in CIVIL CONSTRUCTION
Medical clinic construction work
Medical clinic construction work Surface: 700 m2 Number of persons in charge of execution: 60 Execution time:: 9 months
August 14, 2018
by Danco
in CIVIL CONSTRUCTION
Foundations
Radiation-type foundation of the reactor chamber Surface: 1.008,76 m2 Concrete volume: 968,9 m3 Armature: 93,00 t Metallic parts embedded in concrete: 5,59 t Number of persons in charge with execution: 30 Execution time: 2 weeks Foundation for adhesive tanks Surface: 2.688,00 m2 Concrete volume: 3.763,00 m3 Armature: 99,40 t Metallic parts embedded in concrete: 4,50 [...]- 1
- 2
Popular Posts
Electrogrup partners with FC Universitatea Cluj for the next 3 season
August 7, 2018
The partnership between Electrogrup, a leading company in infrastructure construction, and the most...
Netcity Telecom continues the expansion of the underground fiber optic network of Bucharest
August 8, 2018
Netcity Telecom continues the expansion of the underground fiber optic network of Bucharest with a p...
Electrogrup’s smart projects from 2020, a platform for Romania’s evolution in 2021
February 18, 2021
From the first truly integrated Smart City project in Romania to the smart developments in Câmpia Tu...