DRUMUL MORARILOR 110KV POWER STATION
DRUMUL MORARILOR 110KV POWER STATION
The works included:
- Refurbishment of the command-control room (ceiling, lighting, power, heating and air conditioning, partition walls)
- Repairs to the installations (replacement of pipes, including water leaks, ceramic tile fitting)
- Concrete foundations and support pillars for the mounting of the modular equipment
- Repairs to the foundation of the neutral treatment group for medium voltage networks
- Replacement of the primary 110kV equipment, SF6 modules and of the conductors between the equipment
- Installation of MV feeders
- Replacement of the old control and protection panels with new digital equipment
- Replacement of the AC and DC cabinets
- Replacement of the battery and electric converter
- Grounding network for the equipment in the power station
- Performing working tests and tests for commissioning