NATURAL GAS POWER PLANT, CAMPIA TURZII
The project includes the realization of an electric power assembly consisting of two power plants equipped with generating sets with gas motors, with an individual capacity of 6.72 MW, and the extension of the 20kV distribution network.
The duration of the works is five months.
The plant is located in the Reif Industrial Park, near the photovoltaic park with a capacity of 6MW, owned by Nova Power & Gas, which currently supplies consumers in the area.