This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
ENERGY
April 17, 2024
April 17, 2024
MODERNIZATION OF THE 110/20 KV DOICEȘTI STATION
A photovoltaic park was built, with an installed power of 30 MW, made with 36,800 Trina panels - 655 W, 122 Huawei inverters - 215 kW, 9 Huawei 20 / 0.8 kV - 3.4 MVA transformer stations and the 110 / 20 kV Doicești transformer station was modernized, it being equipped with a 63 MVA [...]
April 17, 2024
CONSTRUCTION OF PHOTOVOLTAIC PARK CEF 3 – NERVIA
Address: Doicesti commune, Dambovita county. Placement of metallic structures and 650 W and 655 W solar panels on the surface of the slag deposit from the old Doicesti thermal power plant for the creation of a renewable energy production unit with a total installed capacity of 30 MW Number of metal structures 1527 pcs Monocrystalline-bifacial [...]
April 17, 2024
IAZ 220/110 kV POWER STATION
Refurbishment of an existing power station. The works took place while keeping the electrical networks, control room, medium voltage networks and the internal services of the station in working order during the project. Successfully completed: - Project Management - Turnkey design - Primary and secondary 220, 110, 20, 0.4 kV equipment installation - SCADA system [...]
April 17, 2024
NATURAL GAS POWER PLANT, CAMPIA TURZII
The project includes the construction of a power plant consisting of two power plants equipped with gas generator sets, with an individual capacity of 6.72 MW, and the expansion of the 20kV distribution network. Implemented works: - Design and authorization - Construction of the building, command center and exterior functionalities - Jenbacher engines of 2x3,35 [...]
April 17, 2024
PHOTOVOLTAIC PARK, CAMPIA TURZII
Installed Power: 6 MW Technical solution: - 24840 solar panels Renesola JC240-24/Bb - 6345 invertors SMA STP17000TL - 17 KW - Aluminum metallic structure, 4 strings x 18 solar panels - Krinner screw - 5 substations 1250 KVA. - Video surveillance system – 58 video cameras - IR access control system - IT Shelter for [...]
August 27, 2018
SANPAUL 110/20KV POWER STATION
SANPAUL 110/20KV POWER STATION The projected involved the construction of a new power station. The works included: Building the command-control building with roof Concrete foundations and roads Concrete ducts for 110kV 20kV cables 110kV pillars and support pillars for the equipment, including foundations Steel structure (frame) for supporting the electrical equipment Civil works: concrete and [...]
August 27, 2018
BIHARIA 110/20KV POWER STATION
BIHARIA 110/20KV POWER STATION The projected involved the construction of a 110/20kV power station The works included: Building the command-control-building with roof Concrete foundations and roads, concrete and steel structure to support the equipment Replacing and connecting a 110kV pylon (including the foundation) 110kV equipment - 110/20kV power transformer, full line cells (2) and transformer, [...]
August 27, 2018
DRUMUL MORARILOR 110KV POWER STATION
DRUMUL MORARILOR 110KV POWER STATION The works included: Refurbishment of the command-control room (ceiling, lighting, power, heating and air conditioning, partition walls) Repairs to the installations (replacement of pipes, including water leaks, ceramic tile fitting) Concrete foundations and support pillars for the mounting of the modular equipment Repairs to the foundation of the neutral treatment [...]
August 27, 2018
BUZAU CRANG 110/20KV POWER STATION
BUZAU CRANG 110/20KV POWER STATION The works included: Installation of LES 20 kV power lines - 1,5km Reconstruction of the medium voltage grids with jointing and terminlas (34 pcs) for the interconnection with substations Installation of new MV equipment (15 cells) and 20 kV switchgear connections Refurbishment of the control room Construction of concrete foundations [...]- 1
- 2
Popular Posts
Campia Turzii Power Station, modernized following a 10 mil. euro investment
August 8, 2018
In mid-November, together with National Power Transmission and System Operator Transelectrica SA, we...
ELECTROGRUP INFRASTRUCTURE SA (E-INFRA) – integrated holding, financial results 2017
August 8, 2018
The company is making public its consolidated 2017 financial results showing 107.5 milion Euro in tu...
Netcity becomes part of the Electrogrup Group
August 8, 2018
Since February this year, Netcity Telecom, the Bucharest’s operator of the underground fiber optic n...