Refurbishment of an existing power station. The works took place while keeping the electrical networks, control room, medium voltage networks and the internal services of the station in working order during the project.
Successfully completed:
– Project Management
– Turnkey design
– Primary and secondary 220, 110, 20, 0.4 kV equipment installation
– SCADA system integration
Modernization for:
– 2 – line cells of 220 kV
– 14 – line cells of 110 kV
– 2 – 220kV autotransformers
– 2 – 220/ 110kV – 200 MVA autotransformers
Civil constructions:
– Refurbishment of the control and connection building
– Replacing the existing foundations
– Replacing the concrete old structure with steel structure
– 220/110 kV autotransformer
– Site works: yard, access roads, alleys, drainage