SANPAUL 110/20KV POWER STATION
SANPAUL 110/20KV POWER STATION
The projected involved the construction of a new power station.
The works included:
- Building the command-control building with roof
- Concrete foundations and roads
- Concrete ducts for 110kV 20kV cables
- 110kV pillars and support pillars for the equipment, including foundations
- Steel structure (frame) for supporting the electrical equipment
Civil works: concrete and green yard, access roads, alleys, fences, drainage, concrete path around the building
The electrical works included:
- 110/20kV power transformer
- Switches, separators, power and voltage transformers
- Medium voltage cells
- Electrical connections (conductors) between equipment
- Installation of the lightning system (normal and safety), interior and exterior
Telecommunication works included:
- Installation of telecommunication equipment
- Installation of telecommunication cables (classic and fiber optic)