Foundations
Radiation-type foundation of the reactor chamber
- Surface: 1.008,76 m2
- Concrete volume: 968,9 m3
- Armature: 93,00 t
- Metallic parts embedded in concrete: 5,59 t
- Number of persons in charge with execution: 30
- Execution time: 2 weeks
Foundation for adhesive tanks
- Surface: 2.688,00 m2
- Concrete volume: 3.763,00 m3
- Armature: 99,40 t
- Metallic parts embedded in concrete: 4,50 t
- Number of persons in charge with execution: 50
- Execution time: 6 weeks